Insights & Benchmarks

Storm Resources Group Benchmark
Avg P10 P50 P90 Avg P10 P50 P90
Operating Days 12.03 8.87 11.79 16.48 14.51 8.41 13.82 21.68
m / Operating Day 333.47 255.14 347.93 393.95 333.62 177.10 324.36 490.03
Drlg % 35.71 31.92 36.20 38.92 42.70 34.28 42.50 51.56
MD 3890.67 3562.80 3995.50 4190.00 4394.33 3576.40 4168.00 5223.40
TVD 1582.06 1560.74 1587.19 1594.36 2064.53 1783.73 2075.59 2413.70
Lateral 2077.71 1808.92 2202.91 2263.50 1999.09 1415.92 1936.90 2749.56
  • 2017 Activity
  • Wells Drilled Coming Soon
  • Wells Completed Coming Soon
  • Wells Producing Coming Soon
  • Top Ranks
  • Metric 1 Coming Soon
  • Metric 2 Coming Soon
  • Metric 3 Coming Soon
  • See all company rankings here.

Company Data


    License No Well Name Surface Location Unique Well Id Operator Contractor Rig No Well Type Prov Loc Type Triple/Double First Bit Size (mm) Last Bit Size (mm) Number of Bits From (m) To (m) Tour Sheet Start Depth to TD (m) Heel (mMD) TD (mTVD) Surface and Vertical Length (m) Tangent and Build Length (m) Lateral Length (m) Tour Sheet Start Date Drilling % Trip % Reaming % Dev Survey and Connections % Directional Work % Cond Mud & Circ % Casing and Cement % Operating Days (d) m / Operating Days (m/d) On Bottom ROP Avg (m/h) Lateral WOB Avg (kDaN) Lateral RPM Avg Lateral Torque Avg Lateral ROP Avg (m/h) Rig Up (h) Drill Actual (h) Reaming (h) Coring (h) Cond Mud & Circ (h) Trips (h) Rig Service (h) Repair Rig (h) Cut Off Drilg Line (h) Dev Survey (h) Wireline Logs (h) Run Csg & Cement (h) Wait On Cement (h) Nipple Up BOP (h) Test BOP (h) Drillstem Test (h) Plug Back (h) Squeeze Cement (h) Fishing (h) Dir Work (h) Safety Meeting (h) Tear Down (h) Waiting On (h) Rig Watch (h) Other (h)
    32509 SRL HZ Nig c-A051-A/094-H-04 c-051-A/094-H-04 200/b-059-D/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 311.0 159.0 4 0 3020 3020 1701.00 1557.72 1314.08 386.92 1319.00 2017-02-01 33.7 15.0 1.8 13.6 1.9 11.4 9.5 8.32 362.85 44.91 6.75 71.25 7999.88 52.76 13.50 67.25 3.50 0.0 22.75 30.00 5.25 0.00 1.25 27.25 0.00 19.00 5.00 6.75 3.50 0.0 0.0 0.0 0.0 3.75 4.50 21.50 5.25 0.0 0.00
    32510 SRL HZ Nig b-051-A/094-H-04 b-051-A/094-H-04 200/d-054-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 311.0 159.0 4 0 3570 3570 1764.00 1565.54 1332.52 431.48 1806.00 2017-02-11 36.1 14.9 3.2 14.3 0.8 9.4 9.6 8.75 408.00 47.13 7.50 70.00 7169.33 58.73 12.75 75.75 6.75 0.0 19.75 31.25 5.00 0.00 1.75 30.00 0.00 20.25 1.25 7.75 5.50 0.0 0.0 0.0 0.0 1.75 3.25 17.25 0.00 0.0 0.00
    32512 SRL HZ c-051-A/094-H-04 c-051-A/094-H-04 200/a-064-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 311.0 159.0 4 0 3562 3562 1726.81 1592.89 1400.65 326.16 1835.19 2017-01-20 36.3 18.3 0.0 12.7 0.5 7.9 9.4 9.97 357.32 41.06 7.56 68.89 6767.38 47.36 25.75 86.75 0.00 0.0 19.00 43.75 7.75 1.25 2.50 30.50 7.00 22.50 2.50 6.00 3.25 0.0 0.0 0.0 0.0 1.25 4.50 18.00 5.00 0.0 0.75
    33731 SRL HZ NIGCREEK c-C088-A/094-H-04 c-088-A/094-H-04 200/b-067-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 7 23 3920 3897 1795.86 1588.89 988.16 807.70 2124.14 2017-10-17 39.0 20.2 1.1 13.6 2.9 5.1 7.1 11.18 348.66 37.29 8.17 70.00 6695.91 46.43 11.25 104.50 3.00 0.0 13.75 54.25 7.75 0.00 2.25 36.50 0.00 19.00 3.00 8.25 3.00 0.0 0.0 0.0 0.0 7.75 5.25 24.50 0.00 0.0 0.00
    33732 SRL HZ Nigcreek c-D088-A/094-H-04 c-088-A/094-H-04 200/d-067-D/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 4 24 3960 3936 1753.00 1620.54 1418.97 334.03 2207.00 2017-10-04 31.8 15.7 0.7 13.6 1.7 5.6 7.7 11.84 332.33 43.61 8.00 65.91 6670.00 49.04 11.50 90.25 2.00 0.0 16.00 44.75 7.25 33.00 1.50 38.75 7.00 21.75 4.00 6.50 2.75 0.0 0.0 0.0 0.0 4.75 4.00 8.00 4.25 0.0 0.00
    33736 SRL HZ Nigcreek c-C065-A/094-H-04 c-065-A/094-H-04 200/a-045-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 4 29 4250 4221 2045.44 1594.52 1017.70 1027.74 2204.56 2017-09-07 38.2 17.7 0.0 16.0 2.0 4.4 7.4 11.96 352.98 38.46 16.70 70.00 7222.38 50.68 15.00 109.75 0.00 0.0 12.50 50.75 8.00 2.00 2.50 46.00 0.00 21.25 4.25 6.75 3.50 0.0 0.0 0.0 0.0 5.75 4.50 26.00 0.00 0.0 9.50
    33737 SRL HZ Nigcrek c-D065-A/094-H-04 c-065-A/094-H-04 200/b-044-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 4 28 4031 4003 1771.03 1563.92 1323.55 447.48 2259.97 2017-08-27 37.1 17.2 1.0 15.5 0.9 5.9 9.6 10.07 397.40 44.60 6.00 70.00 7155.56 52.56 14.50 89.75 2.50 0.0 14.25 41.50 6.75 2.50 2.25 37.50 0.00 23.25 2.75 6.25 4.75 0.0 0.0 0.0 0.0 2.25 4.00 15.75 0.00 0.0 1.50
    NaN STORM NaN NaN STORM RESOURCES LTD. AKITA DRILLING LTD. 31 NaN BC NaN double 251.0 159.0 8 0 4035 4035 1735.20 1588.70 1351.03 384.17 2299.80 2017-07-23 31.2 20.2 0.9 10.1 2.0 6.9 6.9 17.92 225.21 30.06 7.20 53.25 6322.29 23.96 42.00 134.25 4.00 13.0 29.50 87.00 11.00 1.00 3.75 43.25 5.25 29.50 31.50 12.75 5.00 0.0 0.0 0.0 0.0 8.75 7.75 0.00 0.00 368.0 2.75
    33875.0 SRL HZ NIGCREEK C-026-G/094-H-04 c-026-G/094-H-04 200/b-057-G/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 6 18 4090 4072 1858.31 1586.54 1294.26 564.05 2231.69 2017-12-02 37.7 17.2 1.1 13.9 1.9 5.4 8.0 13.31 305.88 33.79 7.90 70.00 6925.10 46.25 16.00 120.50 3.50 0.0 17.25 55.00 8.50 14.50 2.00 44.50 0.00 25.50 3.00 10.50 3.00 0.0 0.0 0.0 0.0 6.00 5.25 24.50 0.00 0.0 0.50
    33876.0 SRL HZ Nig Creek c-A026-G/094-H-04 c-026-G/094-H-04 200/c-056-G/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 6 18 3950 3932 1770.00 1560.39 1283.92 486.08 2180.00 2017-11-18 34.4 17.7 0.7 13.5 1.9 7.6 8.7 12.51 314.30 38.08 7.40 70.00 13700.00 51.29 17.75 103.25 2.25 0.0 22.75 53.00 7.50 0.00 2.50 40.50 5.75 26.00 3.00 15.75 5.25 0.0 0.0 0.0 0.0 5.75 3.75 18.00 0.00 0.0 3.25
    33877.0 SRL HZ Nig Creek c-B026-G/094-H-04 c-026-G/094-H-04 200/d-056-G/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 9 0 4200 4200 1936.11 1577.24 1072.35 863.76 2263.89 2017-10-30 33.0 21.7 2.2 13.2 2.3 10.6 6.1 16.83 249.50 31.52 7.41 67.06 6992.00 36.08 26.75 133.25 8.75 0.0 43.00 87.50 11.75 8.75 3.25 53.25 0.00 24.50 3.00 9.25 3.25 0.0 0.0 0.0 0.0 9.25 5.25 26.25 0.00 0.0 0.00
    34641.0 SRL HZ Nigcreek c-E088-A/094-H-04 c-088-A/094-H-04 200/d-066-A/094-H-04/00 STORM RESOURCES LTD. AKITA DRILLING LTD. 31 HORIZ BC NTS double 251.0 159.0 4 24 4100 4076 1898.74 1587.84 940.51 958.23 2201.26 2017-09-21 40.0 17.2 0.0 14.4 1.7 6.5 8.4 11.74 347.20 36.15 7.70 58.50 7520.89 47.85 25.75 112.75 0.00 0.0 18.25 48.50 8.25 1.25 2.00 40.50 0.00 23.75 3.00 8.00 5.25 0.0 0.0 0.0 0.0 4.75 4.00 16.50 0.00 0.0 1.50

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

    *Data accessed from public sources only.

    Access this Unsist energy dataset directly and download CSV


      Enjoying the free insights?

      We provide much deeper data & analytics than what you see here.
      Contact us to learn more.

      Contact Us