Progress Energy | Group Benchmark | |||||||
Avg | P10 | P50 | P90 | Avg | P10 | P50 | P90 | |
Operating Day | 24.67 | 18.16 | 21.97 | 30.21 | 15.22 | 8.42 | 14.31 | 22.17 |
---|---|---|---|---|---|---|---|---|
m / Operating Day | 162.96 | 207.62 | 167.98 | 121.05 | 320.68 | 469.86 | 311.01 | 174.39 |
Drlg % | 50.80 | 57.21 | 50.40 | 45.26 | 43.28 | 52.21 | 43.20 | 34.39 |
MD | 3790.81 | 4183.40 | 3742.50 | 3459.60 | 3754.19 | 5174.30 | 4164.50 | 3587.00 |
TVD | 1921.16 | 2277.79 | 2005.06 | 1808.71 | 2084.11 | 2417.71 | 2077.54 | 1801.32 |
Lateral | 1557.10 | 1793.71 | 1530.11 | 1401.43 | 1989.83 | 2713.79 | 1920.99 | 1416.28 |
License No | Well Name | Surface Location | Unique Well Id | Operator | Contractor | Rig No | Well Type | Prov | Loc Type | Triple/Double | First Bit Size (mm) | Last Bit Size (mm) | Number of Bits | From (m) | To (m) | Tour Sheet Start Depth to TD (m) | Heel (mMD) | TD (mTVD) | Surface and Vertical Length (m) | Tangent and Build Length (m) | Lateral Length (m) | Tour Sheet Start Date | Drilling % | Trip % | Reaming % | Dev Survey and Connections % | Directional Work % | Cond Mud & Circ % | Casing and Cement % | Operating Days (d) | m / Operating Days (m/d) | On Bottom ROP Avg (m/h) | Lateral WOB Avg (kDaN) | Lateral RPM Avg | Lateral Torque Avg | Lateral ROP Avg (m/h) | Rig Up (h) | Drill Actual (h) | Reaming (h) | Coring (h) | Cond Mud & Circ (h) | Trips (h) | Rig Service (h) | Repair Rig (h) | Cut Off Drilg Line (h) | Dev Survey (h) | Wireline Logs (h) | Run Csg & Cement (h) | Wait On Cement (h) | Nipple Up BOP (h) | Test BOP (h) | Drillstem Test (h) | Plug Back (h) | Squeeze Cement (h) | Fishing (h) | Dir Work (h) | Safety Meeting (h) | Tear Down (h) | Waiting On (h) | Rig Watch (h) | Other (h) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
31113 | PROGRESS HZ W GUNDY D-E2-B/094-B-16 | d-002-B/094-B-16 | 203/c-100-I/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 465 | HORIZ | BC | NTS | triple | 222.0 | 200.0 | 7 | 602 | 3599 | 2997 | 2137.78 | 1973.71 | 1736.91 | 400.87 | 1461.22 | 2015-07-08 | 59.8 | 10.6 | 2.9 | 0.0 | 6.0 | 6.8 | 0.6 | 23.97 | 125.04 | 8.71 | 13.25 | 41.67 | 1782.64 | 21.57 | 31.75 | 344.25 | 16.50 | 0.0 | 39.00 | 61.25 | 16.75 | 1.00 | 3.25 | 0.00 | 0.00 | 3.25 | 3.00 | 5.25 | 9.50 | 0.00 | 0.0 | 0.00 | 0.00 | 34.25 | 27.50 | 1.00 | 16.00 | 0.0 | 10.50 |
31114 | PROGRESS HZ W GUNDY d-F2-B/94-B-16 | d-002-B/094-B-16 | NaN | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 465 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 12 | 0 | 4136 | 4136 | 2259.73 | 2095.12 | 1854.18 | 405.55 | 1876.27 | 2015-02-01 | 54.2 | 12.4 | 2.3 | 0.0 | 6.1 | 8.3 | 4.3 | 29.98 | 137.96 | 10.61 | 11.27 | 40.91 | 3422.45 | 31.01 | 10.75 | 389.75 | 16.50 | 0.0 | 59.75 | 89.50 | 20.00 | 3.50 | 2.75 | 0.00 | 0.00 | 30.75 | 5.25 | 8.00 | 10.75 | 0.00 | 0.0 | 0.00 | 0.00 | 44.00 | 31.75 | 13.75 | 0.00 | 0.0 | 7.25 |
31115 | PROGRESS HZ W GUNDY d-G2-B/94-B-16 | d-002-B/094-B-16 | 202/d-100-I/094-B-09/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 465 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 9 | 0 | 3952 | 3952 | 2063.51 | 1909.57 | 1662.51 | 401.00 | 1888.49 | 2015-02-04 | 56.5 | 10.6 | 2.3 | 0.0 | 5.5 | 6.8 | 4.3 | 29.67 | 133.21 | 9.83 | 12.92 | 40.00 | 1879.67 | 26.51 | 10.75 | 402.00 | 16.25 | 0.0 | 48.25 | 75.25 | 20.25 | 5.00 | 2.75 | 0.00 | 0.00 | 30.75 | 4.00 | 15.00 | 7.75 | 0.00 | 0.0 | 0.00 | 0.00 | 39.50 | 30.25 | 33.00 | 12.25 | 0.0 | 15.00 |
31181 | Progress HZ Graham a-036-F/094-B-8 | a-036-F/094-B-08 | 202/a-015-F/094-B-08/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 630 | HORIZ | BC | NTS | triple | 444.0 | 216.0 | 23 | 40 | 4440 | 4400 | 2928.70 | 2549.91 | 2246.86 | 681.84 | 1511.30 | 2015-10-17 | 49.5 | 19.0 | 0.9 | 4.8 | 1.4 | 5.0 | 4.4 | 59.74 | 73.65 | 6.20 | 11.33 | 47.62 | 15328.57 | 14.67 | 7.25 | 710.00 | 13.50 | 0.0 | 71.00 | 273.00 | 29.00 | 22.75 | 8.00 | 69.25 | 20.00 | 63.00 | 0.00 | 26.75 | 10.75 | 0.00 | 0.0 | 0.00 | 0.00 | 20.00 | 62.00 | 0.00 | 0.00 | 0.0 | 34.75 |
31182 | Progress HZ Graham a-A36-F/94-B-8 | a-036-F/094-B-08 | 203/a-15-F/94-B-08/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 630 | DIR | BC | NTS | triple | 444.0 | 26.0 | 20 | 38 | 4330 | 4292 | 2771.23 | 2379.79 | 2077.48 | 693.75 | 1558.77 | 2015-10-13 | 55.7 | 15.1 | 1.0 | 4.8 | 1.3 | 3.6 | 3.8 | 47.22 | 90.90 | 6.80 | 17.29 | 48.82 | 20313.33 | 18.28 | 16.00 | 631.50 | 11.75 | 0.0 | 41.00 | 171.00 | 21.00 | 3.50 | 7.25 | 54.25 | 0.00 | 43.50 | 6.75 | 26.75 | 11.25 | 0.00 | 0.0 | 0.00 | 0.00 | 15.25 | 70.50 | 12.50 | 2.25 | 0.0 | 18.00 |
31183 | Progress HZ Graham a-B36-F/94-B-8 | a-036-F/094-B-08 | 204/a-015-F/094-B-08/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 630 | HORIZ | BC | NTS | triple | 444.0 | 200.0 | 24 | 38 | 4144 | 4106 | 2516.00 | 2291.75 | 2006.12 | 509.88 | 1628.50 | 2015-10-09 | 52.4 | 16.8 | 1.2 | 3.3 | 2.5 | 4.6 | 3.4 | 52.08 | 78.84 | 6.26 | 14.61 | 46.11 | 19016.67 | 15.58 | 39.25 | 655.50 | 14.75 | 0.0 | 58.00 | 209.50 | 23.75 | 17.25 | 8.25 | 41.00 | 0.00 | 42.25 | 8.00 | 51.75 | 14.75 | 0.00 | 0.0 | 0.00 | 0.00 | 31.50 | 55.75 | 72.00 | 17.00 | 0.0 | 18.00 |
31184 | Progress HZ Graham a-C36-F/94-B-8 | a-036-F/094-B-08 | 200/a-015-F/094-B-08/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 630 | HORIZ | BC | NTS | triple | 444.0 | 171.0 | 15 | 40 | 4286 | 4246 | 2835.58 | 2462.32 | 2163.77 | 671.81 | 1450.42 | 2015-08-09 | 52.4 | 15.8 | 1.3 | 5.6 | 1.7 | 3.4 | 2.5 | 51.75 | 82.05 | 6.53 | 9.43 | 38.70 | 10080.00 | 12.58 | 103.75 | 650.50 | 15.75 | 0.0 | 42.50 | 196.25 | 30.00 | 0.00 | 6.25 | 70.00 | 1.00 | 31.00 | 4.00 | 56.50 | 24.50 | 1.75 | 0.0 | 0.00 | 0.00 | 20.75 | 57.00 | 0.00 | 36.25 | 0.0 | 34.25 |
31189 | Progress HZ Gundy d-G7-H/94-B-16 | d-007-H/094-B-16 | 202/d-095-A/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | AKITA DRILLING LTD. | 21 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 10 | 24 | 4190 | 4166 | 2250.55 | not available | 1836.02 | 414.53 | 1939.45 | 2015-07-02 | 48.6 | 14.9 | 1.5 | 0.0 | 6.2 | 9.1 | 5.7 | 26.34 | 158.14 | 13.56 | 14.54 | 30.38 | 15807.69 | 27.32 | 121.50 | 307.25 | 9.50 | 0.0 | 57.50 | 94.50 | 18.00 | 0.00 | 2.25 | 0.00 | 0.00 | 36.00 | 4.00 | 17.00 | 7.00 | 0.00 | 0.0 | 0.00 | 0.25 | 39.00 | 32.75 | 87.25 | 52.00 | 0.0 | 7.25 |
31190 | Progress HZ Gundy d-H7-H/94-B-16 | d-007-H/094-B-16 | 202/d-095-A/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | AKITA DRILLING LTD. | 21 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 9 | 25 | 4046 | 4021 | 2109.26 | not available | 1692.77 | 416.49 | 1936.74 | 2015-07-10 | 49.8 | 13.2 | 2.2 | 0.0 | 6.0 | 8.9 | 6.1 | 22.04 | 182.43 | 15.27 | 20.60 | 37.00 | 15970.00 | 35.37 | 3.75 | 263.25 | 11.50 | 0.0 | 47.25 | 69.75 | 15.75 | 14.00 | 2.00 | 0.00 | 0.00 | 32.50 | 3.75 | 6.00 | 8.25 | 0.00 | 0.0 | 0.00 | 0.00 | 32.00 | 21.25 | 3.25 | 1.00 | 0.0 | 1.75 |
31191 | Progress HZ Gundy d-I7-H/94-B-16 | d-7-H/094-B-16 | 200/b-027-H/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | AKITA DRILLING LTD. | 21 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 10 | 25 | 3740 | 3715 | 2247.53 | not available | 1831.80 | 415.73 | 1492.47 | 2015-07-13 | 50.5 | 15.2 | 1.9 | 0.0 | 5.6 | 8.1 | 6.8 | 22.15 | 167.75 | 13.85 | 15.30 | 50.00 | 13650.00 | 34.71 | 3.00 | 268.25 | 10.00 | 0.0 | 43.00 | 81.00 | 14.75 | 2.25 | 2.25 | 0.00 | 0.00 | 36.25 | 3.75 | 9.75 | 9.25 | 0.00 | 0.0 | 0.00 | 0.00 | 29.75 | 19.50 | 2.50 | 0.00 | 0.0 | 1.75 |
31192 | PROGRESS HZ GUNDY D-J7-H/094-B-16 | d-007-H/094-B-16 | 202/b-027-H/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | AKITA DRILLING LTD. | 21 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 13 | 25 | 3604 | 3579 | 2096.56 | not available | 1689.46 | 407.10 | 1507.44 | 2015-07-15 | 47.4 | 16.2 | 1.7 | 0.0 | 4.3 | 9.4 | 4.8 | 29.74 | 120.34 | 10.57 | 16.78 | 491.67 | 16655.56 | 37.22 | 2.25 | 338.50 | 12.00 | 0.0 | 66.75 | 115.75 | 19.75 | 0.00 | 5.25 | 0.00 | 0.00 | 34.25 | 4.00 | 17.25 | 8.00 | 0.00 | 0.0 | 0.00 | 32.25 | 30.75 | 24.75 | 1.00 | 0.00 | 0.0 | 4.50 |
31382 | PROGRESS HZ BUBBLES B-024-B/094-G-08 | b-024-B/094-G-08 | NaN | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 10 | 0 | 3796 | 3796 | 1975.71 | 1824.53 | 1596.58 | 379.13 | 1820.29 | 2015-08-01 | 43.8 | 12.0 | 2.7 | 6.8 | 2.6 | 4.3 | 8.5 | 27.81 | 136.49 | 12.98 | 12.88 | 47.94 | 16619.06 | 17.80 | 27.75 | 292.50 | 18.25 | 0.0 | 28.75 | 80.25 | 12.75 | 0.00 | 3.00 | 45.50 | 8.00 | 56.50 | 24.50 | 29.50 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 17.25 | 29.00 | 24.25 | 48.50 | 0.0 | 15.75 |
31384 | Progress HZ Bubbles b-B24-B/94-G-8 | b-024-B/094-G-08 | 203/c-035-B/094-G-08/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | double | 444.0 | 200.0 | 10 | 0 | 3397 | 3397 | 1988.39 | 1817.63 | 1574.58 | 413.81 | 1408.61 | 2015-09-25 | 45.1 | 12.5 | 2.2 | 7.2 | 3.1 | 3.5 | 6.0 | 22.44 | 151.40 | 13.99 | 11.63 | 38.75 | 14798.31 | 17.83 | 13.00 | 242.75 | 12.00 | 0.5 | 19.00 | 67.50 | 12.50 | 11.50 | 4.25 | 39.00 | 0.00 | 32.25 | 16.75 | 12.00 | 8.00 | 0.00 | 0.0 | 0.00 | 0.00 | 16.50 | 23.00 | 22.75 | 1.75 | 0.0 | 21.00 |
31385 | Progress HZ Bubbles b-C24-B/94-G-8 | b-024-B/094-G-08 | NaN | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 444.0 | 200.0 | 9 | 0 | 3249 | 3249 | 1903.45 | 1744.77 | 1509.17 | 394.28 | 1345.55 | 2015-10-19 | 42.3 | 12.2 | 2.3 | 7.4 | 2.8 | 7.3 | 7.0 | 19.32 | 168.14 | 16.58 | 10.17 | 47.08 | 14656.67 | 21.79 | 11.50 | 196.00 | 10.75 | 0.0 | 33.75 | 56.50 | 9.25 | 0.00 | 3.00 | 34.25 | 0.00 | 32.25 | 21.50 | 15.25 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 13.00 | 19.75 | 22.00 | 6.75 | 0.0 | 12.50 |
31386 | Progress HZ Bubbles b-D24-B/94-G-8 | b-024-B/094-G-08 | NaN | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 444.0 | 200.0 | 9 | 0 | 3369 | 3369 | 1973.27 | 1815.81 | 1595.33 | 377.94 | 1395.73 | 2015-11-09 | 47.2 | 13.9 | 2.1 | 6.5 | 3.3 | 3.7 | 7.3 | 19.04 | 176.93 | 15.62 | 12.75 | 48.75 | 14288.18 | 22.97 | 15.50 | 215.75 | 9.50 | 0.0 | 16.75 | 63.50 | 10.75 | 0.00 | 4.00 | 29.75 | 0.00 | 33.50 | 7.25 | 21.25 | 4.75 | 0.00 | 0.0 | 0.00 | 0.00 | 15.00 | 20.25 | 19.75 | 11.75 | 0.0 | 5.00 |
31419 | PROGRESS HZ TOWN b-H035-J-94-B-16 | b-035-J/094-B-16 | 200/b-023-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 9 | 25 | 3745 | 3720 | 2152.80 | 1981.28 | 1749.20 | 403.60 | 1594.20 | 2015-06-27 | 38.7 | 14.9 | 2.0 | 3.5 | 4.1 | 15.5 | 4.9 | 30.31 | 122.72 | 13.21 | 12.65 | 37.06 | 16368.75 | 23.27 | 2.75 | 281.50 | 14.75 | 0.0 | 112.50 | 108.25 | 17.75 | 3.25 | 5.75 | 25.75 | 0.00 | 35.75 | 3.50 | 18.50 | 6.50 | 0.00 | 0.0 | 0.75 | 0.00 | 29.50 | 35.75 | 0.00 | 9.75 | 0.0 | 27.75 |
31420 | PROGRESS HZ TOWN b-I035-J/094-B-16 | b-035-I/094-B-16 | 202/b-023-I/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 7 | 25 | 3569 | 3544 | 2020.70 | NaN | 1570.10 | 450.60 | 1548.30 | 2015-06-25 | 51.8 | 15.0 | 1.9 | 4.0 | 3.0 | 7.5 | 4.5 | 25.05 | 141.47 | 11.38 | 14.07 | 35.67 | 17144.53 | 20.31 | 6.75 | 311.50 | 11.25 | 0.0 | 45.00 | 90.00 | 16.25 | 0.00 | 5.25 | 24.25 | 0.00 | 27.00 | 0.00 | 7.50 | 11.25 | 0.00 | 0.0 | 0.00 | 0.00 | 18.00 | 26.00 | 0.00 | 3.00 | 0.0 | 8.00 |
31421 | PROGRESS HZ TOWN b-J035-J/94-B-16 | b-035-J/094-B-16 | 203/b-023-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 7 | 0 | 3605 | 3605 | 2076.60 | NaN | 1701.40 | 375.20 | 1528.40 | 2015-06-21 | 49.2 | 15.5 | 1.1 | 0.9 | 4.8 | 9.8 | 4.3 | 27.60 | 130.60 | 11.06 | 12.11 | 44.44 | 15982.89 | 15.92 | 7.75 | 326.00 | 7.50 | 0.0 | 65.00 | 102.75 | 17.50 | 0.50 | 5.25 | 6.00 | 0.00 | 28.75 | 4.00 | 10.00 | 12.50 | 0.00 | 0.0 | 0.00 | 0.00 | 31.75 | 35.00 | 1.25 | 10.50 | 0.0 | 10.00 |
31422 | PROGRESS HZ TOWN b-K035-J/94-B-16 | b-035-J/094-B-16 | 200/c-013-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 9 | 24 | 3589 | 3565 | 2163.60 | NaN | 1750.70 | 412.90 | 1425.40 | 2015-06-19 | 47.1 | 15.5 | 3.3 | 0.7 | 4.9 | 8.9 | 5.5 | 24.40 | 146.13 | 12.94 | 12.33 | 52.22 | 15365.67 | 34.77 | 5.50 | 275.50 | 19.25 | 0.0 | 52.00 | 90.50 | 14.75 | 2.50 | 4.50 | 4.00 | 0.00 | 32.25 | 0.00 | 5.75 | 14.50 | 0.00 | 0.0 | 0.00 | 0.25 | 28.75 | 30.50 | 1.25 | 1.75 | 0.0 | 10.50 |
31423 | PROGRESS HZ TOWN b-L035-J/94-B-16 | b-035-J/094-B-16 | 202/c-013-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 24 | 3444 | 3420 | 1995.10 | 1850 | 1611.00 | 384.10 | 1448.90 | 2015-06-17 | 53.2 | 14.4 | 0.7 | 0.0 | 6.2 | 7.9 | 4.1 | 25.31 | 135.11 | 10.59 | 14.80 | 52.00 | 14550.00 | 30.99 | 6.75 | 323.00 | 4.50 | 0.5 | 48.25 | 87.25 | 17.50 | 0.00 | 3.75 | 0.25 | 0.00 | 25.00 | 0.00 | 11.00 | 11.75 | 0.00 | 0.0 | 0.00 | 0.00 | 37.50 | 31.00 | 0.50 | 1.25 | 0.0 | 6.25 |
31424 | PROGRESS HZ TOWN b-M035-J/94-B-16 | b-035-J/094-B-16 | 200/d-014-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 9 | 24 | 3496 | 3472 | 2066.40 | 1915.06 | 1685.40 | 381.00 | 1429.60 | 2015-06-16 | 57.4 | 13.0 | 0.3 | 0.9 | 4.9 | 7.0 | 4.4 | 23.29 | 149.07 | 10.82 | 15.57 | 40.00 | 14958.29 | 34.45 | 2.50 | 320.75 | 1.75 | 0.0 | 39.00 | 72.50 | 14.75 | 0.00 | 4.50 | 5.00 | 0.00 | 24.50 | 0.00 | 2.50 | 8.75 | 0.00 | 0.0 | 0.00 | 0.00 | 27.25 | 29.25 | 1.50 | 0.00 | 0.0 | 8.50 |
31425 | PROGRESS HZ TOWN b-N035 J/94-B-16 | b-035-J/094-B-16 | 202/d-014-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 23 | 3568 | 3545 | 2138.00 | 1983.39 | 1731.50 | 406.50 | 1430.00 | 2015-06-13 | 52.2 | 10.3 | 0.3 | 0.8 | 4.4 | 8.2 | 6.4 | 18.13 | 195.59 | 15.62 | 14.33 | 40.00 | 15846.00 | 43.33 | 3.50 | 227.00 | 1.50 | 0.0 | 35.50 | 45.00 | 10.75 | 0.00 | 4.00 | 3.50 | 0.00 | 28.00 | 0.00 | 11.00 | 16.25 | 0.00 | 0.0 | 0.00 | 0.25 | 19.00 | 22.00 | 1.00 | 11.50 | 0.0 | 11.25 |
31426 | PROGRESS HZ TOWN B-O035-J/94-B-16 | b-035-J/094-B-16 | 203/d-014-J/094-B-16/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 623 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 24 | 3427 | 3403 | 2006.40 | 1849.75 | 1602.90 | 403.50 | 1420.60 | 2015-06-06 | 45.2 | 10.8 | 0.0 | 0.3 | 6.0 | 15.1 | 5.2 | 23.63 | 144.04 | 13.28 | 15.30 | 47.00 | 15111.11 | 27.32 | 59.50 | 256.25 | 0.00 | 0.0 | 85.50 | 61.25 | 13.00 | 1.50 | 3.75 | 1.75 | 0.00 | 29.25 | 0.00 | 11.75 | 6.50 | 0.50 | 0.0 | 0.00 | 0.00 | 34.25 | 40.25 | 119.50 | 62.00 | 0.0 | 21.50 |
31436 | Progress HZ Town a-G76-C/94-G-1 | a-076-C/094-G-01 | 202/a-064-C/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 41 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 8 | 0 | 3992 | 3992 | 2307.41 | 2135.39 | 1911.19 | 396.22 | 1684.59 | 2015-08-20 | 50.0 | 11.3 | 0.9 | 0.0 | 12.0 | 5.3 | 4.7 | 22.32 | 178.83 | 14.90 | 13.56 | 40.00 | 11285.56 | 26.53 | 27.75 | 268.00 | 5.00 | 0.0 | 28.50 | 60.50 | 10.00 | 0.00 | 4.50 | 0.00 | 0.00 | 25.25 | 8.00 | 8.75 | 8.50 | 0.00 | 0.0 | 0.00 | 0.00 | 64.25 | 25.25 | 5.75 | 6.75 | 0.0 | 19.25 |
31437 | Progress HZ Town a-H76-C/94-G-1 | a-076-C/094-G-01 | 203/a-064-C/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 41 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 10 | 23 | 3791 | 3768 | 2238.74 | 2059.56 | 1864.12 | 374.62 | 1552.26 | 2015-09-12 | 53.3 | 13.2 | 1.3 | 0.6 | 9.9 | 4.0 | 4.2 | 26.28 | 143.37 | 11.21 | 12.55 | 47.27 | 11281.82 | 21.05 | 11.75 | 336.25 | 8.50 | 0.0 | 25.50 | 83.50 | 12.75 | 0.50 | 3.75 | 3.50 | 0.00 | 26.25 | 7.75 | 3.50 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 62.75 | 25.25 | 1.75 | 3.75 | 0.0 | 25.00 |
31438 | Progress HZ Town a-I76-C/94-G-1 | a-076-C/094-G-01 | 203/c-054-C/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 41 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 0 | 3812 | 3812 | 2310.07 | 2132.92 | 1930.95 | 379.12 | 1501.93 | 2015-10-08 | 41.8 | 13.6 | 1.8 | 0.3 | 10.5 | 8.7 | 5.9 | 21.39 | 178.25 | 17.77 | 12.38 | 61.25 | 10550.00 | 35.76 | 12.75 | 214.50 | 9.25 | 0.0 | 44.50 | 70.00 | 9.00 | 0.00 | 4.75 | 1.75 | 0.00 | 30.50 | 14.00 | 2.25 | 5.75 | 0.00 | 0.0 | 0.00 | 0.00 | 53.75 | 22.25 | 8.50 | 5.50 | 0.0 | 31.00 |
31439 | Progress HZ Town a-J76-C/94-G-1 | c-076-C/094-G-01 | 204/c-054-C/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 41 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 6 | 23 | 3945 | 3922 | 2343.68 | 2138.64 | 1941.49 | 402.19 | 1601.32 | 2015-10-31 | 47.4 | 12.7 | 0.7 | 0.0 | 14.8 | 4.3 | 6.2 | 20.58 | 190.54 | 16.74 | 11.38 | 45.00 | 13112.50 | 26.47 | 17.50 | 234.25 | 3.25 | 0.0 | 21.00 | 62.75 | 8.00 | 0.00 | 3.50 | 0.00 | 0.00 | 30.75 | 4.50 | 13.75 | 8.50 | 0.00 | 0.0 | 0.00 | 0.00 | 73.00 | 20.00 | 13.75 | 6.50 | 0.0 | 10.75 |
31441 | Progress HZ Town a-L76-C/94-G-1 | a-076-C/094-G-01 | 206/c-054-C/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 41 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 6 | 24 | 3732 | 3708 | 2251.61 | 2077.32 | 1864.35 | 387.26 | 1480.39 | 2015-12-18 | 46.3 | 15.6 | 0.0 | 0.0 | 14.9 | 4.4 | 5.2 | 20.94 | 177.10 | 15.95 | 13.71 | 42.14 | 12412.86 | 26.55 | 18.25 | 232.50 | 0.00 | 0.0 | 22.25 | 78.25 | 8.50 | 3.50 | 4.50 | 0.00 | 0.00 | 26.00 | 5.00 | 17.25 | 5.00 | 0.00 | 0.0 | 0.00 | 0.00 | 74.75 | 21.25 | 55.25 | 0.00 | 0.0 | 3.75 |
31469 | Progress HZ Jedney d-F83-D/94-G-8 | d-083-D/094-G-08 | 200/b-004-E/094-G-08/00 | PROGRESS ENERGY CANADA LTD. | TRINIDAD DRILLING LTD. | 452 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 6 | 0 | 3736 | 3736 | 2144.50 | 1996.01 | 1801.00 | 343.50 | 1591.50 | 2015-10-28 | 49.2 | 12.4 | 1.9 | 11.5 | 2.0 | 3.6 | 7.5 | 15.09 | 247.52 | 20.96 | 14.67 | 30.00 | 14416.67 | 24.58 | 11.25 | 178.25 | 7.00 | 0.0 | 13.00 | 44.75 | 9.50 | 0.00 | 1.50 | 41.75 | 0.00 | 27.00 | 7.00 | 2.00 | 5.75 | 0.00 | 0.0 | 0.00 | 0.25 | 7.25 | 12.50 | 32.00 | 2.50 | 0.0 | 4.75 |
31470 | Progress HZ Jedney d-G83-D/94-G-8 | d-083-D/094-G-08 | 204/d-005-E/094-G-08/00 | PROGRESS ENERGY CANADA LTD. | TRINIDAD DRILLING LTD. | 452 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 0 | 4168 | 4168 | 1997.30 | 1855.26 | 1666.20 | 331.10 | 2170.70 | 2015-11-14 | 49.0 | 13.8 | 3.8 | 9.1 | 1.9 | 2.7 | 7.3 | 19.38 | 215.12 | 18.28 | 16.56 | 36.39 | 13647.06 | 22.09 | 13.50 | 228.00 | 17.75 | 0.0 | 12.75 | 64.25 | 12.50 | 1.75 | 1.50 | 42.50 | 0.00 | 33.75 | 8.00 | 9.50 | 5.50 | 0.00 | 0.0 | 0.00 | 0.00 | 9.00 | 17.50 | 88.00 | 9.50 | 0.0 | 0.75 |
31480 | Progress HZ Lily a-C72-J/94-G-2 | a-072-J/094-G-02 | 200/b-083-J/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 6 | 0 | 3632 | 3632 | 2218.95 | 1072.31 | 1820.69 | 398.26 | 1413.05 | 2015-12-16 | 46.5 | 13.2 | 0.7 | 0.0 | 11.7 | 5.3 | 5.6 | 21.46 | 169.26 | 15.16 | 13.56 | 40.56 | 16833.33 | 32.11 | 8.25 | 239.50 | 3.75 | 0.0 | 27.25 | 68.00 | 9.00 | 5.50 | 3.00 | 0.00 | 0.00 | 29.00 | 5.00 | 29.75 | 9.00 | 0.00 | 0.0 | 0.00 | 0.00 | 60.25 | 21.25 | 2.00 | 12.00 | 0.0 | 4.75 |
31482 | PROGRESS HZ LILY A-E72-J/94-G-2 | a-084-J/094-G-02 | 206/a-072-J/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 5 | 0 | 3578 | 3578 | 2161.36 | 1971.67 | 1762.56 | 398.80 | 1416.64 | 2015-12-12 | 52.2 | 10.0 | 0.0 | 0.0 | 12.1 | 4.3 | 5.6 | 17.99 | 198.89 | 15.88 | 15.67 | 44.44 | 17655.56 | 30.30 | 14.50 | 225.25 | 0.00 | 0.0 | 18.75 | 43.00 | 7.75 | 7.50 | 2.25 | 0.00 | 0.00 | 24.00 | 9.50 | 11.25 | 7.75 | 0.00 | 0.0 | 0.00 | 0.25 | 52.25 | 17.00 | 5.75 | 0.00 | 0.0 | 5.25 |
31483 | PROGRESS HZ LILY A-F72-J/94-G-2 | a-072-J/094-G-02 | 202/a-084-J/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 7 | 0 | 3750 | 3750 | 2206.09 | 2038.65 | 1813.42 | 392.67 | 1543.91 | 2015-12-10 | 50.8 | 8.9 | 0.0 | 4.1 | 6.0 | 3.7 | 4.6 | 21.81 | 171.92 | 14.11 | 13.00 | 46.50 | 16745.00 | 32.85 | 53.00 | 265.75 | 0.00 | 0.0 | 19.50 | 46.50 | 9.50 | 2.00 | 1.50 | 21.25 | 0.00 | 24.00 | 10.25 | 21.25 | 11.25 | 0.00 | 0.0 | 0.00 | 0.25 | 31.50 | 40.25 | 23.50 | 39.00 | 0.0 | 18.75 |
31484 | PROGRESS HZ LILY a-G72-J/94-G-2 | a-072-J/094-G-02 | 203/a-084-J/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 7 | 0 | 3590 | 3590 | 2092.55 | 1897.02 | 1692.41 | 400.14 | 1497.45 | 2015-11-29 | 51.9 | 10.0 | 0.4 | 2.8 | 9.3 | 4.4 | 4.5 | 21.43 | 167.54 | 13.45 | 11.89 | 40.00 | 14500.00 | 33.09 | 94.50 | 267.00 | 2.25 | 0.0 | 22.75 | 51.25 | 8.50 | 22.25 | 0.75 | 14.50 | 0.00 | 23.00 | 9.75 | 8.00 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 47.75 | 29.00 | 39.25 | 48.00 | 0.0 | 1.50 |
31485 | Progress HZ Beg a-C76-F/94-G-1 | a-076-F/094-G-01 | 200/c-087-F/094-G-01/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 52 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 0 | 3757 | 3757 | 2123.90 | 1929.95 | 1710.70 | 413.20 | 1633.10 | 2016-02-06 | 51.8 | 14.5 | 2.7 | 0.3 | 11.1 | 3.3 | 5.0 | 22.42 | 167.60 | 13.48 | 10.77 | 41.54 | 16853.85 | 25.12 | 1.75 | 278.75 | 14.50 | 0.0 | 17.75 | 78.25 | 9.50 | 1.50 | 4.00 | 1.75 | 0.00 | 26.75 | 0.00 | 5.00 | 8.00 | 0.00 | 0.0 | 0.00 | 0.00 | 59.75 | 14.25 | 0.00 | 14.25 | 0.0 | 18.25 |
31528 | Progress HZ Caribou d-C40-H/94-G-7 | d-040-H/094-G-07 | 200/a-051-G/094-G-07/07 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 22 | 3600 | 3578 | 2258.70 | 2088.54 | 1868.80 | 389.90 | 1341.30 | 2015-09-04 | 50.3 | 12.2 | 0.1 | 0.0 | 15.6 | 4.5 | 6.4 | 15.41 | 232.24 | 19.24 | 17.40 | 43.00 | 18000.00 | 35.07 | 44.00 | 186.00 | 0.25 | 0.0 | 16.75 | 45.00 | 4.50 | 0.00 | 2.25 | 0.00 | 0.00 | 23.50 | 4.00 | 7.75 | 2.75 | 0.00 | 0.0 | 0.00 | 0.00 | 57.75 | 15.00 | 7.25 | 7.00 | 0.0 | 4.25 |
31529 | Progress HZ Caribou c-39-H/94-G-7 | c-039-H/094-G-07 | 202/a-051-G/094-G-07/07 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 6 | 0 | 3686 | 3686 | 2293.40 | 2155.94 | 1931.00 | 362.40 | 1392.60 | 2015-09-07 | 53.7 | 11.4 | 0.0 | 0.0 | 14.3 | 3.0 | 5.5 | 17.20 | 214.33 | 16.62 | 14.14 | 37.86 | 18000.00 | 25.67 | 4.00 | 221.75 | 0.00 | 0.0 | 12.25 | 47.25 | 6.25 | 0.00 | 2.25 | 0.00 | 0.00 | 22.75 | 0.00 | 6.50 | 4.25 | 0.00 | 0.0 | 0.00 | 0.00 | 59.00 | 15.50 | 0.00 | 0.00 | 0.0 | 15.00 |
31530 | Progress HZ Caribou c-A39-H/94-G-7 | c-039-H/094-G-07 | 203/a-051-G/094-G-07/07 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 0 | 3545 | 3545 | 2188.67 | 2008.3 | 1782.63 | 406.04 | 1356.33 | 2015-09-09 | 50.0 | 15.8 | 0.6 | 0.0 | 8.8 | 5.3 | 5.3 | 18.74 | 189.17 | 15.76 | 19.63 | 40.63 | 18250.00 | 27.82 | 5.00 | 225.00 | 2.50 | 0.0 | 23.75 | 71.25 | 6.50 | 3.00 | 2.75 | 0.00 | 0.00 | 23.75 | 0.00 | 8.50 | 7.00 | 0.00 | 0.0 | 0.50 | 9.75 | 39.50 | 18.75 | 0.25 | 0.00 | 0.0 | 7.25 |
31531 | Progress HZ Caribou c-B39-H/94-G-7 | c-039-H/094-G-07 | 200/d-051-G/094-G-07/07 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 6 | 0 | 3717 | 3717 | 2257.76 | 2088.08 | 1862.39 | 395.37 | 1459.24 | 2015-09-10 | 57.0 | 13.5 | 0.3 | 0.0 | 9.7 | 3.0 | 4.6 | 16.46 | 225.84 | 16.50 | 15.67 | 39.17 | 19166.67 | 27.02 | 5.25 | 225.25 | 1.00 | 0.0 | 11.75 | 53.25 | 5.00 | 0.00 | 3.00 | 0.00 | 0.00 | 18.25 | 5.75 | 3.25 | 8.00 | 0.00 | 0.0 | 0.00 | 0.00 | 38.50 | 16.50 | 0.00 | 2.75 | 0.0 | 5.50 |
31532 | PROGRESS HZ CARIBOU C-C039-H/094-G-07 | c-039-H/094-G-07 | 200/c-060-H/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 5 | 0 | 3996 | 3996 | 2326.76 | 2154.31 | 1926.12 | 400.64 | 1669.24 | 2015-09-12 | 55.1 | 12.7 | 0.0 | 0.0 | 9.2 | 3.0 | 4.9 | 18.91 | 211.36 | 15.98 | 15.22 | 41.67 | 17066.67 | 24.37 | 1.75 | 250.00 | 0.00 | 0.0 | 13.50 | 57.50 | 6.25 | 0.00 | 2.75 | 0.00 | 0.00 | 22.25 | 8.00 | 14.00 | 7.75 | 0.00 | 0.0 | 0.00 | 0.00 | 41.75 | 16.50 | 0.50 | 0.00 | 0.0 | 13.50 |
31557 | PROGRESS HZ KOBES B-055-L / 094-B-09 | b-055-L/094-B-09 | NaN | PROGRESS ENERGY CANADA LTD. | ENSIGN CANADIAN DRILLING | 66 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 16 | 0 | 4338 | 4338 | 2778.21 | 2614.91 | 2391.55 | 386.66 | 1559.79 | 2015-10-07 | 50.8 | 15.2 | 1.2 | 0.0 | 7.5 | 7.4 | 3.6 | 37.92 | 114.41 | 9.39 | 10.14 | 45.00 | 17665.38 | 19.56 | 42.00 | 462.00 | 10.50 | 0.0 | 67.25 | 138.25 | 18.25 | 4.00 | 1.50 | 0.00 | 9.00 | 33.00 | 3.75 | 18.00 | 5.75 | 0.00 | 0.0 | 0.00 | 0.00 | 68.25 | 35.00 | 56.50 | 35.50 | 0.0 | 35.50 |
31773 | Progress HZ Buckinghorse a-C86-F/94-G-7 | a-086-F/094-G-07 | 202/c-097-F/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 30 | 3567 | 3537 | 2163.18 | 2001.81 | 1766.42 | 396.76 | 1403.82 | 2015-11-30 | 45.4 | 14.8 | 2.1 | 6.9 | 3.3 | 2.8 | 5.3 | 21.70 | 163.01 | 14.96 | 10.00 | 41.00 | 11838.70 | 27.53 | 37.00 | 236.50 | 10.75 | 0.0 | 14.75 | 77.25 | 10.75 | 0.00 | 5.00 | 35.75 | 0.00 | 27.75 | 3.25 | 27.50 | 6.50 | 0.00 | 0.0 | 0.00 | 0.00 | 17.25 | 44.50 | 30.25 | 36.00 | 0.0 | 3.25 |
31774 | PROGRESS HZ BUCKINGHORSE a-D86-F/94-G-7 | a-086-F/094-G-07 | 203/c-097-F/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 0 | 3412 | 3412 | 2011.59 | 1853.09 | 1605.68 | 405.91 | 1400.41 | 2015-12-26 | 47.4 | 13.5 | 3.1 | 6.5 | 2.8 | 4.0 | 9.5 | 20.28 | 168.23 | 14.79 | 13.22 | 35.00 | 13154.33 | 29.96 | 19.50 | 230.75 | 15.25 | 0.0 | 19.50 | 65.75 | 11.75 | 0.00 | 5.00 | 31.75 | 0.00 | 46.25 | 1.25 | 16.75 | 7.00 | 0.00 | 0.0 | 0.00 | 0.00 | 13.75 | 20.75 | 21.75 | 0.00 | 0.0 | 1.25 |
31775 | Progress HZ Bucking Horse a-E86-F/94-G-7 | a-086-F/094-G-07 | 204/c-097-F/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 0 | 3531 | 3531 | 2086.11 | 1935.14 | 1688.02 | 398.09 | 1444.89 | 2016-01-17 | 50.3 | 15.0 | 2.2 | 6.6 | 2.8 | 3.7 | 5.8 | 19.47 | 181.37 | 15.03 | 10.90 | 32.50 | 13177.60 | 26.88 | 15.00 | 235.00 | 10.25 | 0.0 | 17.50 | 70.00 | 10.00 | 0.00 | 4.00 | 30.75 | 0.00 | 27.00 | 4.00 | 9.75 | 8.50 | 0.00 | 0.0 | 0.00 | 0.00 | 13.25 | 19.75 | 13.75 | 8.00 | 0.0 | 7.50 |
31776 | Progress HZ Buckinghorse a-F86-F/94-G-7 | a-086-F/094-G-07 | 205/a-007-K/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 7 | 0 | 3684 | 3684 | 2152.19 | 1994.99 | 1765.88 | 386.31 | 1531.81 | 2016-02-07 | 48.9 | 16.2 | 3.6 | 8.2 | 2.3 | 3.9 | 4.8 | 21.71 | 169.70 | 14.45 | 11.40 | 39.33 | 11566.36 | 21.88 | 12.00 | 255.00 | 19.00 | 0.0 | 20.25 | 84.25 | 11.00 | 0.00 | 3.00 | 42.50 | 0.00 | 25.25 | 8.00 | 9.25 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 12.00 | 18.25 | 11.00 | 8.00 | 0.0 | 7.25 |
31777 | Progress HZ Buckinghorse a-G86-F/94-G-7 | a-086-F/094-G-07 | 202/a-007-K/094-G-07/00 | PROGRESS ENERGY CANADA LTD. | PRECISION DRILLING, DIV OF PDCLP | 512 | HORIZ | BC | NTS | triple | 311.0 | 200.0 | 8 | 0 | 3548 | 3548 | 2020.75 | 1854.12 | 1602.63 | 418.12 | 1527.25 | 2016-03-01 | 46.8 | 15.2 | 2.8 | 9.2 | 2.6 | 3.6 | 5.0 | 20.27 | 175.03 | 15.60 | 13.92 | 46.46 | 13233.69 | 27.03 | 38.25 | 227.50 | 13.75 | 0.0 | 17.75 | 74.00 | 10.00 | 1.75 | 2.50 | 44.75 | 0.00 | 24.25 | 8.00 | 9.75 | 8.00 | 0.00 | 0.0 | 0.00 | 3.00 | 12.75 | 19.25 | 51.25 | 40.00 | 0.0 | 9.50 |
31798 | Progress HZ Lily b-A61-F/94-G-2 | b-061-F/094-G-02 | 200/b-073-F/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 19 | 3986 | 3967 | 2396.60 | 2206.92 | 1974.60 | 422.00 | 1589.40 | 2015-12-12 | 56.8 | 13.9 | 0.0 | 0.0 | 11.7 | 2.0 | 5.4 | 21.90 | 181.18 | 13.29 | 14.20 | 44.00 | 15950.00 | 25.84 | 4.25 | 298.50 | 0.00 | 0.0 | 10.50 | 73.00 | 7.50 | 1.50 | 1.75 | 0.00 | 0.00 | 28.50 | 0.00 | 6.75 | 5.50 | 0.00 | 0.0 | 0.00 | 0.00 | 61.25 | 20.25 | 1.75 | 2.50 | 0.0 | 10.50 |
31799 | Progress HZ Lily b-B61-F/94-G-2 | b-061-F/094-G-02 | 200/d-073-F/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 10 | 19 | 3995 | 3976 | 2462.80 | 2272.47 | 2043.50 | 419.30 | 1532.20 | 2015-12-13 | 47.2 | 18.1 | 0.3 | 0.0 | 12.2 | 2.5 | 4.1 | 24.90 | 159.71 | 14.09 | 10.88 | 56.88 | 15087.50 | 29.75 | 8.75 | 282.25 | 1.50 | 0.0 | 15.00 | 108.00 | 10.25 | 15.50 | 7.25 | 0.00 | 0.00 | 24.50 | 0.00 | 6.75 | 5.75 | 0.00 | 0.0 | 0.00 | 0.00 | 73.00 | 26.75 | 26.75 | 0.00 | 0.0 | 21.00 |
31800 | PROGRESS HZ LILY b-C61-F/94-G-2 | b-061-F/094-G-02 | 202/d-073-F/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 222.0 | 200.0 | 6 | 452 | 3818 | 3366 | 2280.92 | 2115.44 | 1894.69 | 386.23 | 1537.08 | 2016-08-04 | 60.5 | 8.7 | 0.0 | 0.8 | 9.3 | 3.1 | 3.3 | 20.98 | 160.44 | 11.05 | 16.00 | 41.00 | 17190.00 | 29.28 | 54.25 | 304.50 | 0.00 | 0.0 | 15.50 | 43.75 | 8.00 | 12.75 | 4.00 | 4.00 | 0.00 | 16.75 | 5.75 | 11.25 | 7.25 | 0.00 | 0.0 | 0.00 | 0.00 | 47.00 | 19.75 | 34.50 | 55.75 | 0.0 | 3.25 |
31801 | PROGRESS HZ LILY B-D61-F/94-G-2 | b-061-F/094-G-02 | 203/d-073-F/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 222.0 | 200.0 | 7 | 454 | 3895 | 3441 | 2338.00 | 2186.76 | 1961.28 | 376.72 | 1557.00 | 2016-08-31 | 57.3 | 10.0 | 0.5 | 0.5 | 10.1 | 3.5 | 3.4 | 19.70 | 174.69 | 12.71 | 13.13 | 38.75 | 15925.00 | 37.07 | 2.75 | 270.75 | 2.50 | 0.0 | 16.50 | 47.50 | 8.50 | 3.00 | 1.25 | 2.25 | 0.00 | 16.25 | 20.50 | 7.50 | 5.75 | 0.00 | 0.0 | 0.00 | 0.00 | 47.75 | 19.50 | 0.50 | 0.00 | 0.0 | 3.25 |
31802 | PROGRESS HZ LILY B-E61-F/94-G-2 | b-061-F/094-G-02 | 200/c-072-F/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 222.0 | 200.0 | 7 | 458 | 4047 | 3589 | 2451.40 | 2275.41 | 2043.56 | 407.84 | 1595.60 | 2016-09-19 | 62.8 | 9.4 | 0.3 | 0.1 | 10.0 | 4.1 | 4.8 | 18.67 | 192.27 | 12.76 | 14.78 | 36.67 | 17011.11 | 33.95 | 0.00 | 281.25 | 1.25 | 0.0 | 18.25 | 42.00 | 6.50 | 1.25 | 1.50 | 0.25 | 0.00 | 21.50 | 6.00 | 1.75 | 5.25 | 0.00 | 0.0 | 0.00 | 0.25 | 44.75 | 14.25 | 0.00 | 0.00 | 0.0 | 2.00 |
31803 | Progress HZ Lily b-F61-F/94-G-2 | b-061-F/094-G-02 | 202/c-072-F/094-G-02/00 | PROGRESS ENERGY LTD. | ENSIGN CANADIAN DRILLING | 147 | HORIZ | BC | NTS | triple | 222.0 | 200.0 | 5 | 458 | 3885 | 3427 | 2280.00 | 2115.09 | 1894.66 | 385.34 | 1605.00 | 2016-10-08 | 60.0 | 9.7 | 0.0 | 0.0 | 10.5 | 3.8 | 3.9 | 18.24 | 187.89 | 13.04 | 14.89 | 40.00 | 18022.22 | 43.67 | 3.25 | 262.75 | 0.00 | 0.0 | 16.50 | 42.50 | 6.75 | 15.50 | 1.25 | 0.00 | 0.00 | 17.00 | 3.00 | 3.00 | 6.00 | 0.00 | 0.0 | 0.00 | 0.00 | 46.00 | 14.25 | 3.00 | 0.00 | 0.0 | 3.25 |
13804 | Progess HZ Lily a-62-F/94-G-2 | a-062-F/094-G-02 | 200/a-074-F/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 7 | 0 | 4204 | 4204 | 2489.00 | 2276.24 | 1995.90 | 493.10 | 1715.00 | 2015-12-03 | 50.8 | 11.9 | 0.1 | 0.0 | 12.1 | 5.2 | 4.2 | 25.05 | 167.81 | 13.77 | 11.50 | 51.00 | 15420.00 | 23.25 | 66.50 | 305.25 | 0.75 | 0.0 | 31.50 | 71.75 | 10.75 | 0.00 | 3.50 | 0.00 | 8.25 | 25.50 | 0.00 | 20.25 | 8.50 | 0.00 | 0.0 | 0.00 | 0.00 | 73.00 | 28.00 | 50.25 | 0.00 | 0.0 | 14.25 |
31805 | PROGRESS HZ LILY B-061-F/094-G-02 | b-061-F/094-G-02 | 202/a-074-F/094-G-02/00 | PROGRESS ENERGY CANADA LTD. | HORIZON DRILLING, DIV OF WESC | 51 | HORIZ | BC | NTS | double | 311.0 | 200.0 | 9 | 19 | 4046 | 4027 | 2314.30 | 2111.59 | 1829.50 | 484.80 | 1731.70 | 2015-12-10 | 52.1 | 13.0 | 0.7 | 0.0 | 11.3 | 4.0 | 4.8 | 22.74 | 177.09 | 14.15 | 15.30 | 49.50 | 16450.00 | 27.60 | 3.75 | 284.50 | 3.75 | 0.0 | 22.00 | 70.75 | 8.50 | 0.00 | 6.50 | 0.00 | 0.00 | 26.00 | 0.00 | 3.50 | 4.25 | 0.00 | 0.0 | 0.00 | 0.00 | 61.75 | 20.25 | 0.50 | 1.00 | 0.0 | 34.00 |
Coming Soon!
Contact us for requests and get instant updates by joining our newsletter.
Coming Soon!
Contact us for requests and get instant updates by joining our newsletter.
Coming Soon!
Contact us for requests and get instant updates by joining our newsletter.
Coming Soon!
Contact us for requests and get instant updates by joining our newsletter.
Coming Soon!
Contact us for requests and get instant updates by joining our newsletter.
*Data accessed from public sources only.
Access this Unsist energy dataset directly and download CSV
We provide much deeper data & analytics than what you see here.
Contact us to learn more.