Insights & Benchmarks

ARC Resources Group Benchmark
Avg P10 P50 P90 Avg P10 P50 P90
Operating Day 11.04 9.16 10.42 14.60 15.22 8.42 14.31 22.17
m / Operating Day 439.67 482.29 374.62 289.86 320.68 469.86 311.01 174.39
Drlg % 37.63 44.76 38.20 30.06 43.28 52.21 43.20 34.39
MD 4645.17 4734.60 4075.00 3501.20 3754.19 5174.30 4164.50 3587.00
TVD 2050.55 2322.52 1998.80 1940.07 2084.11 2417.71 2077.54 1801.32
Lateral 1799.21 2349.98 1745.00 1328.91 1989.83 2713.79 1920.99 1416.28
  • 2017 Activity
  • Wells Drilled Coming Soon
  • Wells Completed Coming Soon
  • Wells Producing Coming Soon
  • Top Ranks
  • Metric 1 Coming Soon
  • Metric 2 Coming Soon
  • Metric 3 Coming Soon
  • See all company rankings here.

Company Data


    License No Well Name Surface Location Unique Well Id Operator Contractor Rig No Well Type Prov Loc Type Triple/Double First Bit Size (mm) Last Bit Size (mm) Number of Bits From (m) To (m) Tour Sheet Start Depth to TD (m) Heel (mMD) TD (mTVD) Surface and Vertical Length (m) Tangent and Build Length (m) Lateral Length (m) Tour Sheet Start Date Drilling % Trip % Reaming % Dev Survey and Connections % Directional Work % Cond Mud & Circ % Casing and Cement % Operating Days (d) m / Operating Days (m/d) On Bottom ROP Avg (m/h) Lateral WOB Avg (kDaN) Lateral RPM Avg Lateral Torque Avg Lateral ROP Avg (m/h) Rig Up (h) Drill Actual (h) Reaming (h) Coring (h) Cond Mud & Circ (h) Trips (h) Rig Service (h) Repair Rig (h) Cut Off Drilg Line (h) Dev Survey (h) Wireline Logs (h) Run Csg & Cement (h) Wait On Cement (h) Nipple Up BOP (h) Test BOP (h) Drillstem Test (h) Plug Back (h) Squeeze Cement (h) Fishing (h) Dir Work (h) Safety Meeting (h) Tear Down (h) Waiting On (h) Rig Watch (h) Other (h)
    31525 SUNRISE HZ J2-25-78-18W6 12-25-078-18W6 102/09-19-078-18W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS double 279.0 159.0 8 0 4415.0 4415.0 2511.00 2356.13 2099.38 411.62 1904.00 2016-01-03 44.8 14.0 1.8 0.0 15.2 4.2 6.2 16.21 272.39 25.34 10.55 38.64 7109.09 35.26 7.00 174.25 7.00 0.0 16.50 54.50 12.25 0.00 2.00 0.0 0.00 24.25 4.00 7.50 7.00 0.0 0.0 0.0 0.0 59.25 19.25 10.00 8.00 0.0 1.25
    31526 ARCRES HZ SUNRISE K2-25-78-18 02-25-078-18W6 102/08-19-078-17W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 159.0 8 0 4490.0 4490.0 2543.74 2366.47 2138.15 405.59 1946.26 2016-01-21 49.0 13.5 0.0 0.0 15.2 4.9 5.1 15.64 287.17 24.40 10.89 48.89 7088.89 40.76 7.50 184.00 0.00 0.0 18.50 50.75 10.50 0.00 1.50 0.0 0.00 19.00 4.00 5.50 7.75 0.0 0.0 0.0 2.0 57.00 13.75 6.75 8.25 0.0 1.00
    31527 ARCRES HZ SUNRISE L2-25-78-18 02-25-078-18W6 103/08-19-078-17W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 159.0 7 0 4503.0 4503.0 2582.00 2442.39 2237.57 344.43 1921.00 2016-02-06 46.2 15.2 0.3 0.0 14.4 4.0 6.4 14.98 300.62 27.13 12.22 51.11 7266.67 44.42 11.00 166.00 1.00 0.0 14.25 54.50 9.75 1.50 1.50 0.0 0.00 23.00 4.00 6.75 5.00 0.0 0.0 0.0 0.0 51.75 17.25 19.50 4.00 0.0 3.25
    31603 ARCRES HZ PARKLAND 5-9-81-16 05-09-081-16W6 100/14-08-081-16W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 159.0 5 0 3555.0 3555.0 2234.38 2027.54 1753.23 481.15 1326.62 2016-03-29 44.6 11.9 1.1 0.0 17.5 1.9 8.2 9.49 374.62 35.02 13.25 50.00 9575.00 54.71 35.00 101.50 2.50 0.0 4.25 27.00 6.00 0.00 0.75 0.0 0.00 18.75 4.00 3.75 4.75 0.0 0.0 0.0 0.0 39.75 13.25 6.25 19.00 0.0 1.50
    31604 ARCRES HZ PARKLAND A5-9-81-16 05-09-081-16W6 100/14-08-081-16W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 171.0 5 0 3514.0 3514.0 2175.92 1982.62 843.30 1332.62 1338.08 2016-04-10 38.6 12.9 1.2 0.0 16.0 4.0 10.5 11.52 305.01 32.92 15.75 56.25 8237.50 35.92 4.50 106.75 3.25 0.0 11.00 35.75 10.00 0.00 1.00 0.0 7.00 29.00 4.00 4.75 5.25 0.0 0.0 0.0 0.0 44.25 14.50 0.00 7.00 0.0 0.00
    31605 ARCRES HZ PARKLAND B05-09-081-16 05-09-081-16W6 102/14-08-081-16W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 171.0 6 0 3600.0 3600.0 2241.17 2019.03 1721.12 520.05 1358.83 2016-04-22 41.0 15.1 0.0 0.0 9.1 3.9 9.8 11.75 306.38 31.17 14.63 53.75 8587.50 31.24 9.75 115.50 0.00 0.0 11.00 42.50 7.25 0.00 0.50 0.0 18.50 27.75 4.00 11.00 3.75 0.0 0.0 0.0 0.0 25.75 13.25 11.25 0.00 0.0 1.25
    31606 PARKLAND C5-09-81-16W6 05-09-081-16W6 BC 100/14-08-081-16W6/00 ARC RESOURCES PRECISION DRILLING, DIV OF PDCLP 529 HORIZ BC DLS triple 279.0 159.0 5 0 18097.0 18097.0 2280.56 1977.66 1694.79 585.77 1285.44 2016-05-04 40.9 13.3 0.0 0.0 18.6 3.1 7.0 9.49 1907.04 194.07 11.75 41.25 8925.00 58.43 6.75 93.25 0.00 0.0 7.00 30.25 6.25 0.00 0.00 0.0 3.75 16.00 2.00 7.75 6.00 0.0 0.0 0.0 0.0 42.25 12.75 47.75 14.75 0.0 0.50
    32309 ARCRES HZ PARKLAND H12-07-081-16 12-7-81-16 W6 100/01-07-081-16W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 4 24 3608.0 3584.0 2124.92 1970.48 1748.85 376.07 1483.08 2016-12-08 34.9 14.7 0.2 0.0 18.0 5.5 9.6 9.14 392.32 46.85 11.00 70.00 8500.00 79.10 134.75 76.50 0.50 0.0 12.00 32.25 7.50 0.00 1.00 0.0 0.00 21.00 2.00 5.75 1.00 0.0 0.0 0.0 0.0 39.50 19.75 4.00 25.00 36.0 0.50
    32310 ARCRES HZ PARKLAND G12-07-081-16 12-7-81-16 W6 105/04-08-081-16W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 5 6 3777.0 3771.0 2123.09 1969.15 1746.77 376.32 1653.91 2016-12-17 31.2 17.4 0.3 0.0 17.6 4.8 10.9 10.20 369.78 49.46 11.25 70.00 11750.00 100.24 8.75 76.25 0.75 0.0 11.75 42.50 8.50 4.75 2.25 0.0 0.00 26.75 2.00 6.00 2.50 0.0 0.0 0.0 0.0 43.00 17.25 1.00 8.50 0.0 0.50
    32311 ARCRES HZ PARKLAND F12-07-081-16 12-7-81-16 W6 102/05-08-081-16W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 4 6 3919.0 3913.0 2174.00 2013.83 1766.67 407.33 1745.00 2016-12-19 38.2 12.4 0.2 0.0 17.1 7.4 9.3 9.96 392.94 42.88 12.14 70.00 10285.71 65.85 7.75 91.25 0.50 0.0 17.75 29.75 8.25 0.00 1.50 0.0 0.00 22.25 2.00 4.75 3.00 0.0 0.0 0.0 0.0 40.75 16.75 1.25 0.00 0.0 0.50
    32312 ARCRES HZ PARKLAND E12-07-081-16 12-7-81-16 W6 100/05-08-081-16W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 5 6 4075.0 4069.0 2116.19 1972.07 1757.20 358.99 1958.81 2016-12-20 31.9 17.9 0.6 0.0 20.4 4.6 9.2 10.45 389.46 50.86 12.00 68.75 11112.50 84.25 7.00 80.00 1.50 0.0 11.50 45.00 9.75 0.00 2.25 0.0 0.00 23.00 2.00 5.00 1.75 0.0 0.0 0.0 0.0 51.25 17.00 1.25 6.00 0.0 0.75
    32313 ARCRES HZ PARKLAND D12-07-081-16 12-7-81-16 W6 105/13-12-081-17W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 5 6 3498.0 3492.0 2129.02 1964.20 1747.40 381.62 1368.98 2016-12-21 30.3 15.2 0.9 0.0 17.4 7.2 8.5 9.36 372.89 51.35 10.00 70.00 10733.33 124.45 8.75 68.00 2.00 0.0 16.25 34.25 8.25 0.00 1.50 0.0 0.00 19.00 2.00 6.00 3.00 0.0 0.0 0.0 0.0 39.00 15.75 1.50 0.00 30.0 9.75
    32314 ARCRES HZ PARKLAND C12-07-081-16 12-7-81-16 W6 104/13-12-081-17W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 5 6 3490.0 3484.0 2137.03 2007.05 1796.19 340.84 1352.97 2016-12-29 30.0 17.8 0.4 0.0 19.7 4.9 10.6 9.52 365.93 50.86 11.50 70.00 12500.00 108.24 4.00 68.50 1.00 0.0 11.25 40.75 7.00 0.00 2.25 0.0 0.00 24.25 1.50 4.75 6.00 0.0 0.0 0.0 0.0 45.00 15.50 1.50 0.00 0.0 0.75
    32315 ARCRES HZ PARKLAND B12-07-081-16 12-7-81-16 W6 103/13-12-081-17W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 6 6 3391.0 3385.0 2079.06 1961.37 1748.20 330.86 1311.94 2016-12-31 24.0 16.3 1.1 0.0 23.2 4.6 7.8 11.88 285.05 49.42 7.25 65.00 8525.00 84.64 13.50 68.50 3.25 0.0 13.00 46.50 11.00 0.00 2.50 0.0 6.00 22.25 2.00 16.50 5.75 0.0 0.0 0.0 0.0 66.00 20.50 2.50 0.00 0.0 1.25
    32316 ARCRES HZ PARKLAND A12-07-081-16 12-7-81-16 W6 104/04-13-081-17W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 4 6 3520.0 3514.0 2141.00 1998.80 1791.27 349.73 1379.00 2017-01-01 28.3 18.2 0.3 0.0 15.6 5.5 8.6 9.34 376.08 55.34 12.33 63.67 9500.00 88.97 8.75 63.50 0.75 0.0 12.25 40.75 7.50 0.75 1.50 0.0 0.00 19.25 2.00 19.75 2.00 0.0 0.0 0.0 0.0 35.00 17.25 20.00 0.00 0.0 2.00
    32317 ARCRES HZ PARKLAND 12-07-081-16 12-7-81-16 W6 103/04-13-081-17W6/00 ARC Resources Ltd. Beaver Drilling Ltd. 15AC HORIZ BC DLS triple 279.0 159.0 4 6 3689.0 3683.0 2123.06 1958.72 1733.21 389.85 1565.94 2017-01-02 35.6 13.6 0.2 0.0 17.1 5.4 8.7 9.22 399.51 46.77 10.67 70.00 9083.33 76.39 29.00 78.75 0.50 0.0 12.00 30.00 7.75 0.00 1.50 0.0 0.00 19.25 1.50 6.25 9.00 0.0 0.0 0.0 0.0 37.75 16.25 0.50 4.25 0.0 0.75
    32574 ARCRES HZ Septimus H11-34-81-18W6 11-34-81-18 W6 102/09-35-081-18W5 ARC Resources Ltd. Precision Drilling, div of PDC 465 HORIZ BC DLS triple 279.0 159.0 4 0 4253.0 4253.0 2125.50 1935.41 1740.19 385.31 2127.50 2016-12-09 38.0 12.1 0.0 3.9 5.9 13.5 9.1 11.76 361.64 39.66 11.33 50.00 11116.67 89.58 10.25 107.25 0.00 0.0 38.00 34.25 6.00 0.00 1.50 11.0 0.00 25.75 9.75 6.25 8.50 0.0 0.0 0.0 0.0 16.75 12.25 0.00 15.50 0.0 5.00
    32575 ARCRES HZ SEPTIMUS I11-34-81-18W6 11-34-81-18 W6 103/09-35-81-18W6 ARC Resources Ltd. Precision Drilling, div of PDC 465 HORIZ BC DLS triple 279.0 159.0 4 0 4273.0 4273.0 2051.92 1891.35 1702.28 349.64 2221.08 2016-12-06 38.9 13.5 0.0 11.1 7.3 7.8 9.4 10.85 393.67 42.20 12.57 70.00 12014.29 69.96 11.00 101.25 0.00 0.0 20.25 35.25 6.25 0.00 2.25 29.0 0.00 24.50 1.00 5.75 1.75 0.0 0.0 0.0 0.0 19.00 13.50 45.00 8.50 0.0 0.75
    32618 ARCRES HZ INGA B13-26-84-24 13b-26-84-24 W6 100/09-23-084-24W6/00 ARC Resources Ltd. Precision Drilling, div of PDC 529 HORIZ BC DLS triple 279.0 159.0 6 0 4355.0 4355.0 2045.89 1896.51 1694.36 351.53 2309.11 2017-02-15 43.5 11.2 0.0 0.0 18.0 6.9 7.3 13.06 333.40 31.96 11.75 55.00 9160.88 55.98 25.50 136.25 0.00 0.0 21.75 35.00 9.25 0.00 1.50 0.0 0.00 23.00 4.00 11.00 4.00 0.0 0.0 0.0 0.0 56.50 11.25 14.00 7.00 0.0 0.00
    32949 ARCRES HZ PARKLAND G11-04-081-16 11-4-81-16 W6 102/10-34-80-16W6 ARC Resources Ltd. Precision Drilling, div of PDC 465 HORIZ BC DLS triple 279.0 159.0 3 0 4747.0 4747.0 2172.97 2048.80 1816.73 356.24 2574.03 2017-03-04 41.1 11.1 0.0 0.0 3.3 17.9 10.8 8.01 592.60 60.09 11.43 70.00 11171.43 83.03 37.75 79.00 0.00 0.0 34.50 21.25 4.00 0.00 2.25 0.0 0.00 20.75 0.00 9.75 2.00 0.0 0.0 0.0 0.0 6.25 12.50 16.50 18.50 0.0 0.00
    32950 ARCRES HZ PARKLAND F11-04-081-16 11-4-81-16 W6 102/16-34-080-16W6 ARC Resources Ltd. Precision Drilling, div of PDC 465 HORIZ BC DLS triple 279.0 159.0 5 0 4685.0 4685.0 2332.31 2188.09 1973.64 358.67 2352.69 2017-03-07 43.1 12.4 0.0 0.0 5.0 17.3 8.0 10.42 449.76 43.48 13.29 70.00 13714.29 67.70 5.25 107.75 0.00 0.0 43.25 31.00 6.25 0.00 1.25 0.0 6.50 20.00 0.00 5.00 3.50 0.0 0.0 0.0 0.0 12.50 13.00 0.75 0.00 0.0 0.00
    32951 ARCRES HZ PARKLAND E11-04-081-16 11-4-81-16 W6 105/16/-06-081-16W6 ARC Resources Ltd. Precision Drilling, div of PDC 465 HORIZ BC DLS triple 279.0 159.0 4 0 4470.0 4470.0 2130.86 2068.35 1841.19 289.67 2339.14 2017-03-08 36.0 18.2 0.0 0.0 5.3 15.7 9.7 9.11 490.42 56.76 12.33 70.00 10166.67 84.29 5.75 78.75 0.00 0.0 34.25 39.75 5.00 0.00 1.25 0.0 0.00 21.25 0.00 9.25 6.50 0.0 0.0 0.0 0.0 11.50 11.00 1.00 5.50 0.0 0.25
    33114 ARCRES HZ DAWSONCREEK F09-21-079-14 9-21-79-14 W6 NaN ARC Resources Ltd. Precision Drilling, div of PDC 542 HORIZ BC DLS triple 251.0 159.0 5 6 4915.0 4909.0 2356.66 2146.70 1773.89 582.77 2558.34 2017-03-06 35.4 16.0 2.4 0.0 18.3 3.8 6.5 12.47 393.70 46.31 15.08 70.00 11961.54 51.95 32.75 106.00 7.25 0.0 11.25 47.75 8.75 0.00 1.75 0.0 14.75 19.50 0.00 3.50 1.75 0.0 0.0 0.0 0.0 54.75 18.75 70.00 24.00 0.0 3.50

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.

      Coming Soon!

      Contact us for requests and get instant updates by joining our newsletter.


    *Data accessed from public sources only.

    Access this Unsist energy dataset directly and download CSV



      Enjoying the free insights?

      We provide much deeper data & analytics than what you see here.
      Contact us to learn more.

      Contact Us